{"id":2750,"date":"2017-03-22T12:02:50","date_gmt":"2017-03-22T16:02:50","guid":{"rendered":"https:\/\/michigan.it.umich.edu\/news\/?p=2750"},"modified":"2024-07-08T06:06:31","modified_gmt":"2024-07-08T10:06:31","slug":"wifi-update","status":"publish","type":"post","link":"https:\/\/michigan.it.umich.edu\/news\/2017\/03\/22\/wifi-update\/","title":{"rendered":"WiFi update"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The WiFi Project team continues to upgrade buildings across campus. Visit the <\/span><a href=\"http:\/\/its.umich.edu\/projects\/wifi-upgrade\/\"><span style=\"font-weight: 400;\">project website<\/span><\/a><span style=\"font-weight: 400;\"> for additional information.<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\"><b>Recently completed:<\/b><span style=\"font-weight: 400;\"> GG Brown, Walgreen Drama Center\/Stamps, Engineering Research Bldg. 1, Engineering Research Bldg. 2<\/span><\/li>\n<li style=\"font-weight: 400;\"><b>Currently under construction:<\/b><span style=\"font-weight: 400;\"> \u00a0Dental Bldg. Lay Automotive Engineering Laboratory, \u00a0East Hall, Nuclear Engineering Lab, West Hall, Ross School of Business, School of Social Work, Gerstacker Bldg., W. K Kellogg Foundation Institute, <\/span><\/li>\n<li style=\"font-weight: 400;\"><b>Network design underway:<\/b><span style=\"font-weight: 400;\"> Wyly Hall, School of Information (North), Helen Newberry Residence Hall, Kinesiology Bldg., Cooley Bldg., Industrial and Operations Engineering Bldg. Community Dentistry, Naval Architecture and Marine Engineering, Martha Cook, Environmental and Water Resources Engineering, Space Research Laboratory, South Hall, Lurie Engineering Center, Betsy Barbour House<\/span><\/li>\n<li style=\"font-weight: 400;\"><b>Site surveys scheduled\/completed:<\/b><span style=\"font-weight: 400;\"> Schembechler Hall, Phoenix Memorial Project Laboratory<\/span><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-1011\" src=\"https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-192x140.jpg\" alt=\"Wifi_icon2\" width=\"300\" height=\"219\" srcset=\"https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-192x140.jpg 192w, https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-150x109.jpg 150w, https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg 501w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The WiFi Project team continues to upgrade buildings across campus. Visit the project website for additional information. Recently completed: GG Brown, Walgreen Drama Center\/Stamps, Engineering Research Bldg. 1, Engineering Research Bldg. 2 Currently under construction: \u00a0Dental Bldg. Lay Automotive Engineering Laboratory, \u00a0East Hall, Nuclear Engineering Lab, West Hall, Ross School of Business, School of Social Work, Gerstacker Bldg.,\u2026 <span class=\"read-more\"><a href=\"https:\/\/michigan.it.umich.edu\/news\/2017\/03\/22\/wifi-update\/\">Read More &raquo;<\/a><\/span><\/p>\n","protected":false},"author":22,"featured_media":1011,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","_umich_oidc_access":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_ef_editorial_meta_date_first-draft-date":"","_ef_editorial_meta_paragraph_assignment":"","_ef_editorial_meta_checkbox_needs-photo":"","_ef_editorial_meta_number_word-count":"","footnotes":""},"categories":[7],"tags":[83],"class_list":["post-2750","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects-services","tag-wifi"],"uagb_featured_image_src":{"full":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",501,365,false],"thumbnail":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-150x109.jpg",150,109,true],"medium":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-192x140.jpg",192,140,true],"medium_large":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",501,365,false],"large":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",501,365,false],"1536x1536":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",501,365,false],"2048x2048":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",501,365,false],"excerpt-thumbnail":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-200x140.jpg",200,140,true],"themonic-thumbnail":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-60x42.jpg",60,42,true],"ioslider-thumbnail":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-501x300.jpg",501,300,true],"post-thumbnail":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",501,365,false],"400x250-crop":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",343,250,false]},"uagb_author_info":{"display_name":"Patty Giorgio, ITS Communications","author_link":"https:\/\/michigan.it.umich.edu\/news\/author\/pgiorgio\/"},"uagb_comment_info":0,"uagb_excerpt":"The WiFi Project team continues to upgrade buildings across campus. Visit the project website for additional information. Recently completed: GG Brown, Walgreen Drama Center\/Stamps, Engineering Research Bldg. 1, Engineering Research Bldg. 2 Currently under construction: \u00a0Dental Bldg. Lay Automotive Engineering Laboratory, \u00a0East Hall, Nuclear Engineering Lab, West Hall, Ross School of Business, School of Social&hellip;","_links":{"self":[{"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/posts\/2750","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/comments?post=2750"}],"version-history":[{"count":3,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/posts\/2750\/revisions"}],"predecessor-version":[{"id":2752,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/posts\/2750\/revisions\/2752"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/media\/1011"}],"wp:attachment":[{"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/media?parent=2750"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/categories?post=2750"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/tags?post=2750"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}