{"id":2024,"date":"2017-02-25T15:30:48","date_gmt":"2017-02-25T20:30:48","guid":{"rendered":"https:\/\/michigan.it.umich.edu\/news?p=2024&#038;preview=true&#038;preview_id=2024"},"modified":"2024-07-08T06:06:34","modified_gmt":"2024-07-08T10:06:34","slug":"wifi-upgrades-3","status":"publish","type":"post","link":"https:\/\/michigan.it.umich.edu\/news\/2017\/02\/25\/wifi-upgrades-3\/","title":{"rendered":"WiFi upgrades"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1011 alignright\" src=\"https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg\" alt=\"Wifi_icon2\" width=\"299\" height=\"218\" srcset=\"https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg 501w, https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-150x109.jpg 150w, https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-192x140.jpg 192w\" sizes=\"auto, (max-width: 299px) 100vw, 299px\" \/><\/p>\n<p>The WiFi Project team continues to upgrade buildings across campus. Visit the <a href=\"http:\/\/its.umich.edu\/projects\/wifi-upgrade\/\">project website<\/a> for additional information.<\/p>\n<ul>\n<li style=\"font-weight: 400;\"><b>Recently completed:<\/b><span style=\"font-weight: 400;\"> Randall Laboratory, Kresge Business Admin Library, Computer Executive Education Bldg.<\/span><\/li>\n<li style=\"font-weight: 400;\"><b>Currently under construction:<\/b><span style=\"font-weight: 400;\"> G.G. Brown, , Walgreen Drama Center, Dental Bldg. Lay Automotive Engineering Laboratory, \u00a0East Hall, Stamps Auditorium,<\/span><\/li>\n<li style=\"font-weight: 400;\"><b>Network design underway:<\/b><span style=\"font-weight: 400;\"> Wyly Hall, School of Information (North), and W. K Kellogg Foundation Institute, Helen Newberry Residence Hall, Kinesiology Bldg., School of Social Work, Gerstacker Bldg., Cooley Bldg., Industrial and Operations Engineering Bldg., Engineering Research Bldg. 2,, Community Dentistry, Naval Architecture and Marine Engineering, Martha Cook, Environmental and Water Resources Engineering, Space Research Laboratory, South Hall, Lurie Engineering Center, Ross School of Business, West Hall, Engineering Research Bldg. 1, Betsy Barbour House<\/span><\/li>\n<li style=\"font-weight: 400;\"><b>Site surveys scheduled\/completed:<\/b><span style=\"font-weight: 400;\"> Schembechler Hall, Phoenix Memorial Project Laboratory<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The WiFi Project team continues to upgrade buildings across campus. Visit the project website for additional information. Recently completed: Randall Laboratory, Kresge Business Admin Library, Computer Executive Education Bldg. Currently under construction: G.G. Brown, , Walgreen Drama Center, Dental Bldg. Lay Automotive Engineering Laboratory, \u00a0East Hall, Stamps Auditorium, Network design underway: Wyly Hall, School of Information (North), and\u2026 <span class=\"read-more\"><a href=\"https:\/\/michigan.it.umich.edu\/news\/2017\/02\/25\/wifi-upgrades-3\/\">Read More &raquo;<\/a><\/span><\/p>\n","protected":false},"author":22,"featured_media":1011,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","_umich_oidc_access":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_ef_editorial_meta_date_first-draft-date":"","_ef_editorial_meta_paragraph_assignment":"","_ef_editorial_meta_checkbox_needs-photo":"","_ef_editorial_meta_number_word-count":"","footnotes":""},"categories":[7],"tags":[83],"class_list":["post-2024","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects-services","tag-wifi"],"uagb_featured_image_src":{"full":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",501,365,false],"thumbnail":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-150x109.jpg",150,109,true],"medium":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-192x140.jpg",192,140,true],"medium_large":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",501,365,false],"large":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",501,365,false],"1536x1536":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",501,365,false],"2048x2048":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",501,365,false],"excerpt-thumbnail":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-200x140.jpg",200,140,true],"themonic-thumbnail":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-60x42.jpg",60,42,true],"ioslider-thumbnail":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2-501x300.jpg",501,300,true],"post-thumbnail":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",501,365,false],"400x250-crop":["https:\/\/michigan.it.umich.edu\/news\/wp-content\/uploads\/2017\/01\/Wifi_icon2.jpg",343,250,false]},"uagb_author_info":{"display_name":"Patty Giorgio, ITS Communications","author_link":"https:\/\/michigan.it.umich.edu\/news\/author\/pgiorgio\/"},"uagb_comment_info":0,"uagb_excerpt":"The WiFi Project team continues to upgrade buildings across campus. Visit the project website for additional information. Recently completed: Randall Laboratory, Kresge Business Admin Library, Computer Executive Education Bldg. Currently under construction: G.G. Brown, , Walgreen Drama Center, Dental Bldg. Lay Automotive Engineering Laboratory, \u00a0East Hall, Stamps Auditorium, Network design underway: Wyly Hall, School of&hellip;","_links":{"self":[{"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/posts\/2024","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/comments?post=2024"}],"version-history":[{"count":3,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/posts\/2024\/revisions"}],"predecessor-version":[{"id":2400,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/posts\/2024\/revisions\/2400"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/media\/1011"}],"wp:attachment":[{"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/media?parent=2024"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/categories?post=2024"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/michigan.it.umich.edu\/news\/wp-json\/wp\/v2\/tags?post=2024"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}